Morning News Bites – September 7

In Today’s Morning News Bites for September 7. Victoria announced its road map out of their COVID19 second wave, Hancock Prospecting leads the field of top 500 private companies taking over from Visy and Novak Djokovic out of US Open after hitting a linesperson in a non deliberate but serious manner.

Dreadnought Resources Limited announces that a 36 hole, ~3,500m RC drill program has commenced at the Illaara Gold-VMS-Iron Ore Project, located 160km northwest of Kalgoorlie. Drilling will commence at Metzke’s Find (19 holes and ~2,300m) which has previously returned high grade gold intercepts including; 2m @ 12.8 g/t Au from 51m including 1m @ 24.8 g/t Au from 51m. Rig will then move to the recently defined Longmore’s Find (17 holes and ~1,200m) and is expected to be completed in 3-4 weeks with assays expected throughout October 2020.

The National Battery Stewardship Scheme to boost spent battery collection and recycling according to Lithium Australia. The ACCC has authorised the Battery Stewardship Council to establish and operate a national stewardship scheme for managing end-of-life (‘EOL’) batteries. The Scheme will impose a levy on batteries at their point of sale, with the funds generated used to subsidise their collection and recycling. The value imputed by the levy will provide a commercial incentive to divert batteries from landfill, a positive environmental outcome of the Scheme. Diverting EOL batteries from landfill will provide more material for processing at the Melbourne, Victoria-based mixed-battery recycling facility of Envirostream Australia Pty Ltd (a 90% subsidiary of the Company).

Auroch Minerals Limited is pleased to announce RC drilling has commenced at its Valdez Prospect, part of the Leinster Nickel Project (Leinster) in Western Australia. 1,000m Reverse Circulation (RC) drill programme is underway at the Valdez Prospect targeting a recently-defined nickeliferous basal channel coincident with both magnetic and surface electromagnetic (EM) anomalies. All drill-holes will be surveyed with downhole electromagnetics (DHEM) to better define the surface EM conductor and provide targeting for potential massive nickel sulphidesfor the next round of exploration.

Hammer Metals Ltd provides results from its diamond drilling program undertaken on the Shadow and Toby prospects located within the Mt Isa East Joint Venture area and on the Koppany prospect located within Hammer’s JV with Mount Isa Mines. Two holes were drilled at the Shadow prospect, for a total of 372m and a further hole was drilled at Toby (252m). The drilling at Shadow confirms that the Shadow trend is mineralised and has the potential to host a significant Copper Deposit. With the presence of a wide zone of copper mineralisation in the first two holes the JV has committed to expanding the work program along the remainder of the 4km magnetic trend and the surrounding Mt Philp areas. This work program will consist of soil sampling and field mapping with the aim of identifying targets for follow up drilling.

WA-focused gold exploration and development company Classic Minerals Limited announce that it has received assays results from its maiden auger soil program at its Forrestania Gold Project in Western Australia. The Company completed a total of 310 auger holes at the Kat Gap project. The auger drilling has delivered a substantial gold anomaly located in the granite west of the main granitegreenstone contact where Classic has identified an inferred gold resource of 975,722t at 2.96g/t for 92,856 ounces. Kat Gap is strategically located approximately 70km south-south east of the Company’s Forrestania Gold project containing the Lady Magdalene and Lady Ada gold resources.

 

Morning News Bites – Jul 31

In today’s morning news bites:

AMP has provided an update on its first half 20 details where it completed the sale of AMP Life, several junior explorers have reported their quarterly reports this week and PM Scott Morrison meets with Victorian Premier Daniel Andrews on further restrictions as the PM also says there is no reason to keep WA borders closed.

  • Mandrake Resources continues to develop Newleyine into a highly prospective Ni-Cu-PGE target. Newleyine is located around 30km east of Chalice Gold’s Julimar Ni, Cu, PGE project. While drilling at Mandrake’s Northern Territory – Berinka Pine Creek Gold Project is set to begin next week.
  • The development of Classic Minerals to become a gold producer continues. According to Classic Minerals, RC Drilling at Kat Gap is set to continue into the FY21 with targets on the interpreted plunge component of high-grade gold mineralisation with deeper RC drilling. Quarter 1 FY21 will also include advancing all aspects of the mining plan at Kat Gap, the acquisition of necessary mining equipment for Kat Gap and continuing to raise capital & pay down debt & liabilities to improve the financial position of the Company.
  • 460,000-ounce gold ore reserve has been declared at six deposits within 50 km of the Ora Banda Mining plant, this was one of the highlights for Ora Banda Mining for the previous quarter. An AISC of $1,578 /oz is one of the key outcomes within the DFS for an Australian gold price of $2,550. The recent capital raising Equity capital raising was strongly supported and proceeds from the equity raising, together with existing cash, will see Ora Banda fully funded through to production at Davyhurst, targeted for January 2021

    Dacian Gold
    Dacian are within FY20 guidance
  • Dacian Gold is within guidance for its Mount Morgans Gold Operation, reporting 138,814 oz at an AISC of $1,619/oz which was within guidance of between 138,000-144,000 ounces at MMGO AISC $1,550-1,650/oz for the financial year. Drilling programs commencing at the Cameron Well and Mt McKenzie deposits will take place within the first half of 2021 financial year. As of June 30, Dacian had a total cash and unsold gold on hand of $57.3 million.
  • Drill results at Kirkland Gold’s Fosterville Gold Mine have been released with several key intersects with Infill drilling into the Swan Mineral Reserves which included 976 g/t Au over 7.4 m, 933 g/t Au over 6.4 m  and 416 g/t Au over 6.8 m. According to Tony Makuch, President and CEO of Kirkland Lake Gold “Drilling at Fosterville continues to demonstrate the significant size and scale of the mineralised structures, all of which contain quartz veining with 2 visible-gold and all of which have the potential to host additional Swan or Swan-like zones. At the Swan Zone, results from new infill drilling include higher than expected grades, which is encouraging as we work towards our next Mineral Reserve and Mineral Resource update. In particular, the infill results confirm that the area where the Swan Fault and Swan Footwall Splay intersect contains more gold than currently modelled.” Kirkland also released Q2 results which included revenue more than doubling on same quarter in 2019, solid operating results and $537.4 million with no debt.

Morning News Bites – July 20

Prime Minister Scott Morrison’s popularity has increased to its highest level in 12 months in the latest Newspoll, COVID-19 spread in New South Wales attracting more concerns and interest around Newmont and Northern Star Resources as NSR let lapse its exclusive purchase rights according to the AFR.

  • Classic Minerals has purchased a Gekko Processing Plant to use at Kat Gap 130km south east of Southern Cross. The gravity concentration processing plant has a capacity of 30 tph and is a flexible design for mobility is scaleable to a Gekko Python Plant with a processing capacity of 250tph. The Gekko plant is ideally suited to the Kat Gap ore which has a very unique high level of gravity gold concentration.
  • Kin Mining has announced a new Australian share holder who has subscribed for $1m in shares while Kin`s two largest shareholders (Delphi and Harmanis) subscribed for an additional $573,000. Kin has restricted the amount of new shares on offer after the recent rights issue. Phase 3 drilling is fully funded until the end of FY 2021 and a strong news flow from drilling is expected. Kin Mining’s Managing Director, Andrew Munckton, said “The additional funds raised through the placement of this Shortfall, together with the $6.066 million already raised from the Rights issue, gives us the capacity to complete our Phase III exploration program across the Cardinia exploration targets to the end of FY2021, as planned.”  
  • The new camp at Aurora Tank has arrived and has been installed at Marmota for it’s, Aurora Tank Gold Discovery. The camp is operational and drillers are expected on site tomorrow (July 21 2020). Marmota recently raised $6.5M and received a $225,000 grant from the South Australian Government as part of the Accelerated Discovery Initiative. 
  • South32 has achieved record production in Australia with its Australia Manganese Ore Joint Venture in the FY20, alongside record results at its Brazil Alumina and Hillside Aluminium operations. Australia Manganese saleable ore production increased by 4% as Manganese ore sales increased as market conditions were favourable. S32 saw saleable production increase by 2% at its 86% share Worsley Alumina, where improvement initiatives are expected to support a sustainable increase in production to nameplate capacity.  While Cannington in Queensland has reduced its run of mine stocks and a further improvement in underground mine performance helped push a 14% lift in ore processed. According to South32 CEO Graeme Kerr,  “Our priority remains keeping our people safe and well, maintaining reliable operations and supporting our communities through the COVID-19 pandemic. Despite the health crisis, we delivered a strong operating result, highlighted by annual production records at Brazil Alumina, Hillside Aluminium and Australia Manganese ore. We have continued to see good demand for our products, with sales exceeding production at the majority of our operations. With uncertainty remaining in global markets we continue to manage our financial position to ensure we retain the right balance of flexibility, efficiency and prudence. Looking forward we remain focussed on reducing controllable costs, managing counterparty and supply chain risk and optimising working capital to ensure the business remains resilient during a potentially extended period of volatility and lower commodity prices.”
  • Drilling for Thomson Resources at their Harry Smith gold prospect on the Lachlan Fold Belt in New South Wales, has been put on hold due to wet ground. However drilling is being undertaken and has commenced at Yalgogrin gold project while waiting for ground to dry at Harry Smith. Wet weather, fog and the ground conditions around Harry Smith has meant the suitability of drilling is not conducive and the time for the ground to dry will take a number of days. This has resulted in the AMWD drilling rig being mobilised to Yalgogrin. Once ground is suitable, drilling will recommence at Harry Smith.

 

 

Quick Notes –

Legend Mining has added Oliver Kiddie to its board as an Executive Director. Mr Kiddie will commence August 10 2020 as Derek Waterfield will move away from his board role and take up the role of General Manager Exploration.

Halloysite confirmed across the Eyre Pennisula for Archer Materials. Greg English, Archer Chairman said “We have directly identified halloysite, which is a high value form of the alumina-silicate clay kaolin, at Kelly Tank, Bunora and Bunora East prospects. This is an excellent result that confirms reports of the [kaolin] mineralisation by historic explorers, as well as the presence of halloysite across a large geographical area with all samples tested being close to surface.”

Morning News Bites – July 9

After yesterday announcing a 7.5c dividend due next week, Northern Star finished the day up 90c. Busiest month ever for luxury car sales and Test cricket returned overnight.

Rio Tinto has announced it will close its New Zealand Aluminium Plant – Tiwai Point Aluminium Smelter. A date of August 31 2021 has been announced as the wind-down of operations. “We’re very disappointed to have played our part in delivering these savings for one of the greenest smelters in the world and to have such limited engagement from Rio Tinto. We urge Rio Tinto to seriously consider the offer for improved electricity supply and encourage them to consider what is right for Southland, for New Zealand and for their own global environmental commitments.” Said Contact Energy CEO Mike Fuge. Contract Energy are an energy supplier in New Zealand.

Black Cat Syndicate has had a busy start to the financial year with drill results from its Bulong Gold Project bringing about high grade results and approval granted for a Pit at Myhree. The results from drilling at Bulong have returned with highlights of 8m @ 26.43 g/t Au from 55m, 10m @ 5.60 g/t Au from 10m and 1m @ 12.70 g/t Au from 42m. According to MD Gareth Solly “The continued shallow, high-grade results bode well for early cashflow from potential mining operations at Myhree. These results infill the existing Resource and are among the best widths and grades to date. This is testament to the robust nature of the Myhree deposit.” While approvals for the Stage 1 Open Pit have been granted and recent drilling has seen some encouragement in the East West structure. “In addition, an important step in our objective to develop Bulong has been achieved with the full approval of the Stage 1 Open Pit at Myhree. We also saw some encouragement from an east-west structure at Myhree and 600m north of Trump north that requires follow up. RC drilling to further test and extend these areas will recommence during August 2020. In the meantime, diamond drilling of the deeper Mhyree mineralisation, is currently underway.” Mr Solly said.

New high grade gold lode has been uncovered by Classic Minerals at Kat Gap. Best results from recent drilling uncovered 4 metres grading 76.72 grams per tonne gold from 79 metres 9 metres grading 8.69 grams per tonne gold from 14 metres. CEO of Classic Minerals Dean Goodwin said “This new very high-grade intersection out into the granite is an exciting development for the Kat Gap Project. We decided to extend some of our planned drill holes west of our current drill pattern to see if further gold lodes were lurking out in the granite. We were right. Now we just have to work out what orientation this new lode is running at. We had a feeling something was out there as we had a handful of old historical drill holes along strike that had a few lower grade sniffs out in the granite. This new intersection really bodes well for our future drilling programs that will be conducted out in the granite following up the historical auger geochemical anomalies.” Kat Gap is located Kat Gap approximately 70km south-south east of the Company’s Forrestania Gold Project.

Focus Minerals has announced the new JORC 2012 Minerals Resource for the Greenfields gold deposit. A total Mineral Resource has been announced as 139,123oz (measured and indicated) That has been completed after an overhaul of the Greenfields open pit resource model and has delivered an 81% increase in Mineral Resource. Focus Minerals’ CEO, Mr Zhaoya Wang, said: “On behalf of the Board of Directors, I would like to commend the team for the diligent work in reexamining historical data of Greenfields. We look forward to what the new PFS could bring to Coolgardie.  At the same time, Focus is continuing its exploration efforts at our 100%-owned Laverton Gold Project. In line with our stated commitments, the Laverton PFS study will be completed by December 2020. The Greenfields Ore Reserve in the 2017 PFS should not be relied upon as it was built on the previous resource model. The updated PFS will be completed in early August, which will provide the updated ore reserve numbers.” Greenfields is 3.8km from Coolgardie is Western Australia.

Julimar is becoming a hive of activity for Chalice Gold and recent drill results including 3.9m @ 1.7g/t Pd, 0.4g/t Pt, 0.5g/t Au, 0.1% Ni, 0.7% Cu, 0.02% Co from 314.9m to end-of-hole  including: 10.1m @ 2.9g/t Pd, 0.6g/t Pt, 1.2g/t Au, 0.1% Ni, 1.3% Cu, 0.01% Co. These results point to a new style of PGE-copper-gold mineralisation at Gonneville. Two RC and a diamond drill are on site and continuing with a drill program at the Gonneville Intrusion. The Intrusion hosts both extensive high-grade PGE-Ni-Cu-Co zones in massive/matrix/stringer sulphides and widespread PGE mineralisation in disseminated sulphides. Current and future activities include an approx 20,000m Phase 2 RC drill program is underway utilising two rigs, a diamond drill program which will continue to step-out from known high-grade zones and test new DHEM targets, Metallurgical testwork, EM Geophysics and the ability to access approvals.